Commissioning & Testing
Comprehensive commissioning and testing services to ensure system readiness
Overview
Proper commissioning and testing are critical to ensuring your systems perform as designed. Our commissioning team systematically verifies every component and system function before your facility goes into production.
We follow structured commissioning protocols including Factory Acceptance Testing (FAT) and comprehensive Site Acceptance Testing (SAT). All testing is documented with detailed reports and certifications.
Our NETA-accredited technicians use calibrated test equipment and follow industry best practices for electrical testing, including insulation resistance, dielectric withstand, and protective relay testing.
Capabilities
- Factory Acceptance Testing (FAT)
- Site Acceptance Testing (SAT)
- Loop checking and testing
- Functional performance testing
- Power system commissioning
- Control system validation
- Safety system proof testing
- Documentation and as-built drawings
- Process and instrument tubing flushing and leak testing
Our Process
Pre-Commissioning
Inspection, preparation, and ITP planning.
Factory Testing
FAT in a controlled environment.
Site Testing
SAT and integration testing.
Performance Validation
Functional verification and documentation.